5-Step Pre-Payment ChecklistHow to verify a Made-in-China.com supplier before sending a T/T deposit
1. Download and inspect the full Audited Supplier report
Do not stop at the green badge icon. Check the audit date, legal company name, registration number (USCC), number of production lines, and whether the inspector verified a manufacturer or a trading company.
2. Validate the 18-digit USCC and company name structure
Paste the USCC from the audit report or business licence into our USCC Decoder (confirming 91 enterprise status and province match) and run the company name through the Company Name Analyzer.
3. Match the PI issuer and bank beneficiary
Many Made-in-China.com machinery suppliers move negotiations to WhatsApp or email and invoice from a Hong Kong Limited or XTransfer account. Document the written collection bridge using our Hong Kong & offshore bank account guide before wiring.
4. Verify product certificates independently
For machinery, solar, and industrial equipment, check CE, ISO 9001, or UL claims using our Certificate Verification Wizard.
5. Tie balance payments to inspection or Factory Acceptance Testing (FAT)
For high-value machinery orders, structure milestones (e.g., 30% deposit / 70% only after video FAT or third-party pre-shipment inspection) rather than wiring full payment upfront.